we all went out to the site to see the work that's been done and become familiar with the work that we're about to do. the footings and preliminary plumbing are done--the ICF walls are next. we then all caravaned to the shop at GURP to check out the great shop space and get the shop ready to roll. to put it mildly, the shop is equipped! we have the mac-daddy of just about every piece of shop equipment imaginable! we met with Robert for a few minutes to discuss what needed to be done in the shop, and he gave us the schedule for the rest of the week. half of us worked on site construction signs and gathered all the tools for inventory; the other half (that's my half) worked on installing the dust collection system to all the equipment. we almost finished, but we ran short on hose and rings. it was a fun day in the shop. we've got a great team, and we work well together. that's soooo important, and soooo rare. i'm very proud to be part of this team and project. and tomorrow (thursday), we're going onsite to prepare the footings for the ICF walls. everyday's an adventure!
Tuesday, January 27, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment